Nhà> Blog> Pump and electric valve effective sealing conditions

Pump and electric valve effective sealing conditions

December 13, 2023

The effective sealing of the pump and motorized valve depends on the overall condition of the individual components. Special attention must be paid to the equipment that needs to be replaced before the packing is installed, in accordance with the site and the system. The following is used to guide the maintenance staff, engineers and assemblers to properly install and adjust the packing.
1, the tools needed in the removal of the old packing root need to use a special tool, and with the fastener pre-gland nut. In addition, regular safety equipment and compliance with relevant safety regulations are required.
Prior to installation, first familiarize yourself with the following equipment: Cutter to verify the packing ring, calibrate the torque wrench or wrench, helmet, internal and external calipers, fasteners lubricants, mirrors, pan picker, Tools, vernier caliper and so on.
2, cleaning and inspection. Slowly loosen the gland nut of the stuffing box to release any residual pressure in the packing assembly, remove any old packing and thoroughly clean the shaft / rod stuffing box; check shaft / rod for corrosion, dents, scratches Or excessive wear; Check other parts for glitches, cracks, wear, they will reduce the packing life; Check the packing box for excessive clearance and shaft / rod eccentricity; Replace the larger defects of parts; : Check the old packing root as a basis for failure analysis to find out the reasons for the early failure of the packing.
3, measurement and recording. Record shaft / rod diameter, stuffing box aperture and depth, and when sealing the ring with water, record the distance from the bottom to the top of the stuffing box.
4, choose packing. Make sure that the chosen packing should meet the operating conditions required by the system and the equipment. Calculate the packing cross-sectional area and the number of packing rings required based on the measurement records. Check the packing to ensure it is defect-free. Before installation, ensure Equipment and packing clean.
5, packing ring preparation. Braided packing Winding the packing on a suitably dimensioned shaft or using a calibrated packing ring cutter; cutting the packing neatly into pairs (square) or miter (30-45 degrees) on request, cutting one at a time Ring, and with the shaft or stem to check the size is appropriate.
Molded packing, to ensure that the ring size and shaft or stem with the precise fit, if necessary, according to the packing manufacturer's operating guidelines or requirements cutting ring.
6, installation packing. Carefully install a packing ring at a time, placing each ring around a shaft or stem. Before installing the next ring, make sure the ring is fully seated in the stuffing box and the next ring should be staggered, at least 90 degrees apart, the general requirements of 120 degrees. After the last ring is installed, tighten the nut by hand and press it down evenly. If there is a water seal, check that it is at the correct distance from the top of the stuffing box. At the same time to ensure that the shaft or stem can rotate freely.

This article Keywords: pump    valve

Liên hệ chúng tôi

Author:

Ms. Lucia Peng

Phone/WhatsApp:

+8613531888018

Sản phẩm được ưa thích
You may also like
Related Categories

Gửi email cho nhà cung cấp này

Chủ đề:
Thư điện tử:
Tin nhắn:

Your message must be betwwen 20-8000 characters

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Gửi